{"id":31094,"date":"2026-06-05T12:19:20","date_gmt":"2026-06-05T10:19:20","guid":{"rendered":"https:\/\/www.hbm.hu\/?page_id=31094"},"modified":"2026-06-05T12:19:20","modified_gmt":"2026-06-05T10:19:20","slug":"water-engineering-structures","status":"publish","type":"page","link":"https:\/\/www.hbm.hu\/en\/water-engineering-structures\/","title":{"rendered":"Water engineering structures"},"content":{"rendered":"

Varsolt Potable Water Reservoir Dam Rehabilitation<\/h4><\/div>

2008<\/p>\n<\/div>

Location: Varsolt, Romania
\n<\/span>Partner: S.C Hidroconstructia S.A.<\/span><\/p>\n<\/div>

\n

Our mission was to construct a slurry wall along the existing embankment of the reservoir to control water flow. Several unique solutions were implemented to meet the strict environmental requirements and the ambitious project schedule: pre\u2011mixed self\u2011hardening slurry material was used for the 1st time in the region, a mobile guide beam and a custom-made trench cutter were developed. In addition24\/7 continuous the operations were done.<\/p><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>
<\/div><\/div><\/div>

Potable Water Reservoir Dam Rehabilitation<\/h2>

Varsolt<\/p><\/div><\/div><\/span><\/div><\/div><\/div><\/div><\/div>

Kisdelta Flood Protection Structures<\/h4><\/div>

2013-2014<\/p>\n<\/div>

Location: Gyula, Hungary
\n<\/span>Partner: K\u00d6TIVIZIG<\/p>\n

<\/span><\/p>\n<\/div>

In addition to the specializ deep\u2011foundation works, we were in charge of the realization of the entire reinforced concrete structure of the flood-control infrastructure. <\/span>Approximately 11,000 m\u00b3 of concrete were poored to finish the project. We are proud that our efforts were prizedthe Construction Industry Award for Excellence.<\/span><\/div><\/p>\n<\/div><\/div><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div>

Kisdelta Flood Protection Structures<\/h2>

Gyula<\/p><\/div><\/div><\/span><\/div><\/div><\/div><\/div><\/div>

Tisza-T\u00far Flood Relief Reservoir<\/h4><\/div>

2019-2022<\/p>\n<\/div>

Location: Tiszabecs, Hungary
\n<\/span>Partner: M\u00e9sz\u00e1ros \u00e9s M\u00e9sz\u00e1ros Zrt.<\/p>\n

<\/span><\/p>\n<\/div>

We were responsible for the design and build foundation works and the construction only structural works of this complex flood\u2011control and water\u2011management development.<\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>
<\/div><\/div><\/div>

Tisza-T\u00far Flood Relief Reservior<\/h2>

Tiszabecs<\/p><\/div><\/div><\/span><\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1830,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"100-width.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-31094","page","type-page","status-publish","hentry"],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t