Varsolt Potable Water Reservoir Dam Rehabilitation

2008

Location: Varsolt, Romania
Partner: S.C Hidroconstructia S.A.

Our mission was to construct a slurry wall along the existing embankment of the reservoir to control water flow. Several unique solutions were implemented to meet the strict environmental requirements and the ambitious project schedule: pre‑mixed self‑hardening slurry material was used for the 1st time in the region, a mobile guide beam and a custom-made trench cutter were developed. In addition24/7 continuous the operations were done.

Potable Water Reservoir Dam Rehabilitation

Varsolt

Kisdelta Flood Protection Structures

2013-2014

Location: Gyula, Hungary
Partner: KÖTIVIZIG

In addition to the specializ deep‑foundation works, we were in charge of the realization of the entire reinforced concrete structure of the flood-control infrastructure. Approximately 11,000 m³ of concrete were poored to finish the project. We are proud that our efforts were prizedthe Construction Industry Award for Excellence.

Kisdelta Flood Protection Structures

Gyula

Tisza-Túr Flood Relief Reservoir

2019-2022

Location: Tiszabecs, Hungary
Partner: Mészáros és Mészáros Zrt.

We were responsible for the design and build foundation works and the construction only structural works of this complex flood‑control and water‑management development.

Tisza-Túr Flood Relief Reservior

Tiszabecs