Varsolt Potable Water Reservoir Dam Rehabilitation
2008
Location: Varsolt, Romania
Partner: S.C Hidroconstructia S.A.
Our mission was to construct a slurry wall along the existing embankment of the reservoir to control water flow. Several unique solutions were implemented to meet the strict environmental requirements and the ambitious project schedule: pre‑mixed self‑hardening slurry material was used for the 1st time in the region, a mobile guide beam and a custom-made trench cutter were developed. In addition24/7 continuous the operations were done.

Potable Water Reservoir Dam Rehabilitation
Varsolt
Kisdelta Flood Protection Structures
2013-2014
Location: Gyula, Hungary
Partner: KÖTIVIZIG

Kisdelta Flood Protection Structures
Gyula
Tisza-Túr Flood Relief Reservoir
2019-2022
Location: Tiszabecs, Hungary
Partner: Mészáros és Mészáros Zrt.
We were responsible for the design and build foundation works and the construction only structural works of this complex flood‑control and water‑management development.

Tisza-Túr Flood Relief Reservior
Tiszabecs