Project description:
One of the most spectacular venues of the 2017 Budapest World Water Championships was created with the involvement of our experts. We were the ones who carried out the piling works of the 65-ton steel diving board set up on Batthyány Square overlooking the Danube. The structure and the pool below were built onto a 17×47 meter reinforced concrete foundation in the riverbed. The work had to be performed from barges anchored on the Danube which was also hampered by the sudden flooding too. With the support of Soletanche Bachy’s French engineers, the substructure of the tower was completed in time, following a 24-hour work schedule.

Customer:
Public sector
Contractor:
HSP Hídépítő Speciál Építőipari Kft.
Date of assignment:
2017.
Applied technology:
Bored pile supported by slurry, Jet-Grouting
Related projects
- Rescue of archaeological remains during bridge construction – The new Tisza Bridge near Tiszapüspökibarvai2020-07-31T18:17:31+02:00
- Five floors deep in the heart of the city – The Szervita Square Buildingbarvai2020-07-31T18:17:13+02:00
- High board over the Danube – A giant diving board on Batthyány Squarebarvai2020-07-31T18:17:01+02:00
- Landscape protection with modern civil engineering technologies – Lake Tiszabarvai2020-07-31T18:16:34+02:00
- The bath is back to its old shape again – Palatinus Bath (historical monument reconstruction)barvai2020-07-31T18:16:11+02:00
- Rescue of archaeological remains during bridge construction – The new Tisza Bridge near Tiszapüspökibarvai2020-07-31T18:17:31+02:00
- Five floors deep in the heart of the city – The Szervita Square Buildingbarvai2020-07-31T18:17:13+02:00
- High board over the Danube – A giant diving board on Batthyány Squarebarvai2020-07-31T18:17:01+02:00
- Landscape protection with modern civil engineering technologies – Lake Tiszabarvai2020-07-31T18:16:34+02:00
- The bath is back to its old shape again – Palatinus Bath (historical monument reconstruction)barvai2020-07-31T18:16:11+02:00
Social networks